An overview of things as of May 18th, 2004
|
Just added this wood skirting to hide the concrete blocks yesterday.
|
The skirting is made from treated landscape timbers. I liked the olive green coloring in contrast to the deck board color.
|
Coloring is irregular from one board to the next. I'd considered buying bamboo for this skirting, but this was cheaper and seems to look great.
|
Lots of cutting is required to make the skirting boards from the timbers. Had to vacuum up plenty of treated (copper and arsenic) sawdust.
|
The skirting is made from panels that are simply set into place.
|
The back of one of the panels. The cut surfaces and ends are "field treated" with a preservative, thus the brown color.
|
The two lower pools in the waterfall are functional and almost complete. Some landscape still to go. The Iron Mountain flagstone works great for spillways. I used mortar to seal gaps on the lower falls. Rinsed it with vinegar to dissolve the lime. But then I read about using expanding foam sealant and tried that on the upper falls. Seems to work great.
|
The middle falls, made from three tiers of flagstone.
|
The lowest pool in the water fall. Varying sizes of river rock were used, including a few big stones to add some visual interest.
|
The upper falls and stream from the biofilter still under construction.
|
Three sizes of river rock sorted in buckets.
|
A close-up of the recessed valve box used for the drain in the lowest waterfall pool.
|
The waterfall drain valve.
|